2024欧洲杯竞猜

Well-Resourced 学校 at 2024欧洲杯竞猜

选项

Well-Resourced 学校 Planning and Recommendations

The System of Well-Resourced 学校 initiative aims to stabilize and improve our schools. This plan begins with our schools that serve our preschool through 5th grade students.

Our primary responsibility is to create schools that are equitable and excellent, ensuring that we operate within our resources to maintain the stability and health of our district for the future.  We believe that high-quality instruction includes creating schools that are culturally responsive and provide inclusion of all students in meaningful ways. (SPS董事会政策0010). 

正在考虑的方案

SPS is creating two alternative models/scenarios as the district works to stabilize and improve our school system.

As you review the proposed options below, please know these are drafts under consideration.

Superintendent Jones will present the preliminary recommendation with the Well-Resourced 学校 proposal to the School Board in October. The School Board will vote on the proposal before winter break (Dec. 2024).

建议方案A

储蓄: $31.500万年

52所学校(21所关闭)

过渡到一个系统 attendance area elementary schools with no K-8 or option elementary schools.​

Draft interactive boundary change tool 建议方案A.

了解更多有关此提案的信息.

建议方案B

储蓄: $25.500万年

56所学校(17所关闭)

选择K-8学校 in each region; reduce the budget using other strategies including additional staffing reductions.​

Draft interactive boundary change tool 建议方案B.

了解更多有关此提案的信息.

An illustration with group of people with speech bubble above to to represent community discussion
社区会议

To ensure everyone has the opportunity to understand these proposals and share feedback, we are hosting a series of meetings.

9月. 和10月. 2024社区会议
大致减少赤字

选项A:大约31美元.预算减少500万

选项B:大约25美元.预算减少500万 (Approximately $6 million will need to be offset with other budget cuts)

学校的规模当前的
学校数量
选择一个
# 的学校
选项B
# 的学校
150或以下1 01
150-1997 00
200-24910 00
250-29913 23
300-34916 6
350-39911 1210
400-4496 1114
450-4998 8 5
500+1 13 10
Please note: 选项B column excludes five K-8 option schools.

建议方案A

建议一个 includes 52 schools ​(21 closing)​ and creates system of attendance area elementary schools (no K-8 or option elementary schools).​ Students in grades 6-8 who currently attend K-8 schools will be served at their attendance area middle schools.

  • 储蓄: $31.500万年
  • 52 elementary schools​ (21 closing)
  • ​Transition to attendance area elementary schools (no K-8 or option elementary schools).​

参见下面的选项A学校:

参观 Criteria, Data, and Analysis webpage to see the work informing these proposals.

A graphic of binoculars with stars in each lens
选择一个: Interactive Map (draft)

Draft interactive boundary change tool 建议方案A.

查看选项边界地图工具

西雅图西北部:选项A

Northwest 学校 that Remain Open:《2024欧洲杯竞猜》, 惠蒂尔, 亚当斯, Viewlands, 詹姆斯·鲍德温, 格林伍德, 卡斯卡底古陆, 丹尼尔·巴格利, 约翰·斯坦福, 麦当劳, B.F. 西林地的一天

  • 关闭:​ Licton弹簧 K-8​, 鲑鱼湾 K-8​, 北海滩​, Broadview-Thomson K-8​
  • 学校类型变化: ​约翰·斯坦福, 麦当劳, and 卡斯卡底古陆 become attendance area schools

西雅图东北部:选项A

Northeast 学校 that Remain Open:奥林匹克山, 黑狼, 奥运会的看法, 约翰·罗杰斯, 韦奇伍德, 桑顿溪, 布赖恩特, 视图脊, 砂点

  • 关闭:​ 绿色的湖​, 迪凯特​, 萨卡加维亚​, 雪松公园​, 请​
  • 学校类型变化: 桑顿溪 小学 becomes an attendance area school, 黑狼 K-8 becomes an attendance area K-5 school​; while 请 building serves as interim site for 砂点

西雅图市中心:选项A

中心学校继续开放:劳顿, 木兰, Coe, 安妮女王, Montlake, 洛厄尔, Leschi, Madrona, 贝利Gatzert, 瑟古德·马歇尔, 金博, 约翰·缪尔

  • 关闭:​ 凯瑟琳布莱恩 K-8​, 约翰干草​, McGilvra​, 史蒂文斯​, 上衣 K-8​
  • 学校类型变化: 安妮女王 小学 becomes an attendance area school

西雅图东南部:选项A

Southeast 学校 that Remain Open:​ ​Beacon Hill, 枫木, Dearborn Park, 冉冉升起的新星, 霍桑, MLK Jr., 翼卢克, 南海岸, 爱默生 ​

  • 关闭:​ 虎鲸 K-8​, 格雷厄姆·希尔​, 邓拉普​, 雷尼尔山的观点​
  • 学校类型变化: 南海岸 PreK-8 becomes an attendance area K-5 school​

Southwest and 西西雅图: 选择一个

西南运营学校:乙醇, 杰纳西山, 费尔蒙特公园, 探路者, Gatewood主持, 西西雅图, Roxhill, 高地公园, 康科德, 杆高度

  • 关闭:​ 拉斐特​, Boren STEM K-8​, Sanislo​
  • 学校类型变化: 探路者 K-8 becomes an attendance area K-5 school

建议方案B

方案B includes 56 schools ​(17 closing)​ and creates a system of attendance area elementary schools and one option K-8 school in each region.

  • 储蓄: $25.500万年
  • 56 schools elementary and K-8 schools ​(17 closing)​​
  • Keeps an option K-8 school in each region
  • Reduce the budget using other strategies including staffing reductions

参见下面的选项B学校:

参观 Criteria, Data, and Analysis webpage to see the work informing these proposals.

A graphic of binoculars with stars in each lens
选项B: Interactive Map (draft)

Draft interactive boundary change tool 建议方案B.

查看选项B边界地图工具

西雅图西北部

Northwest 学校 that Remain Open: 忠诚的高度, 惠蒂尔, 亚当斯, 大马哈鱼湾K-8(选修学校), Viewlands, 詹姆斯·鲍德温, 格林伍德, 卡斯卡底古陆, 丹尼尔·巴格利, 约翰·斯坦福国际学校, 麦当劳, B.F. 西林地的一天

  • 关闭:​ Licton弹簧 K-8​, 北海滩​, Broadview-Thomson K-8​
  • 学校类型变化: ​约翰·斯坦福, 麦当劳, and 卡斯卡底古陆 become attendance area schools

选项B

Northeast 学校 that Remain Open: 奥林匹克山, 黑兹尔·沃尔夫K-8(可选), 奥运会的看法, 约翰·罗杰斯, 萨卡加维亚, 韦奇伍德, 桑顿溪, 布赖恩特, 视图脊, 砂点

  • 关闭:​ 绿色的湖​, 迪凯特, 雪松公园, 请​
  • 学校类型变化:​ 桑顿溪 becomes an attendance area school.​ 请 building serves as interim site for 砂点

西雅图市中心

中心学校继续开放: 劳顿, 木兰, Coe, 安妮女王, Montlake, 洛厄尔, 上衣 K-8(可选), Leschi, Madrona, 贝利Gatzert, 金博, 约翰·缪尔

  • 关闭: ​凯瑟琳布莱恩 K-8​, 约翰干草, McGilvra, 史蒂文斯, 瑟古德·马歇尔​
  • 学校类型变化: 安妮女王 小学 becomes attendance area school​

选项B

Southeast 学校 that Remain Open: Beacon Hill, 枫木, Dearborn Park, 冉冉升起的新星, 霍桑, MLK Jr., 翼卢克, 南海岸 PreK-8 (option), 爱默生, 邓拉普​

  • 关闭:​ 虎鲸 K-8, 格雷厄姆·希尔, 雷尼尔山的观点

Southwest and 西西雅图 选项B

Southwest 学校 that Remain Open:乙醇, 杰纳西山, 费尔蒙特公园, 拉斐特, 探路者K-8(可选), Gatewood主持, 西西雅图小学, Roxhill, 高地公园, 康科德, 杆高度

  • 关闭: Sanislo K-8的Louisa Boren